The status of requests that have been submitted:
Status | Requested by | Procedure |
---|---|---|
Under examination | Aedes | Removal of bonded spandrel panels (max. 10-15% chrysotile) |
Public consultation | RIONED |
Extension of the application domain for a previously validated working method for the removal of drainage elements with asbestos-containing joint filler. Extension concerns the presence of max. 10% chrysotile and 10% amphibole asbestos (instead of max. 10% chrysotile and 2% amphibole asbestos). |